North Eastern Railroad
2004
Central Division
---------------------------
Route:
Chippewa
Work Order:
NECV-010-042
Next Work Order:
NECV-010-043
Divisional Special: SW
- CT
Contract: RP - CV Coal
Turn around
Type: Road Work
Time: 9:45 A.M.
Season: Winter
Weather: Clear
Difficulty: Easy
Train: AC6000
Class: 1
Call Sign: No. 1 Train
---------------------------
Activity Description:
This work order is No.
1 Train, (Part 1)
You have just
taken over the SW
Division Train and will be continuing onto
Meridean Power. Once
there at Meridean, you
need to swap the loaded hoppers with the empties on
Meridean 1 and 2. Once
connected to the empties at
Meridean, you need to back down the main to
Dunnville Lumber where
you need to back into the Wye. You take the first
leg of the WYE when backing down the main, and then
pull forward on the second part of the leg, heading
back to the main towards the SW Division. The work
order will end there automatically because you will
be waiting for the RP - CV No.2 Train. The reverse
point at Meridean is to
get you back to the Wye.
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR
management trust that
you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25 MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the
above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35 MPH
Main Switch = 45 MPH
Station
Stop (within
the platform) = 10 MPH
Drive Safely!
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net