North Eastern
Railroad 2004
Central Division
---------------------------
Route:
Chippewa
Work Order: NECV-010-043
Divisional Special:
SW - CT
Contract: RP - CV
Coal Turn around
Type: Road Work
Time: 10:45 A.M.
Season: Winter
Weather: Clear
Difficulty: Easy
Train: AC6000
Class: 1
Call Sign: No. 1
Train
---------------------------
Activity Description:
This work order is
No. 1 Train, (Part 2)
You are waiting for
the RP - CV Coal Turn No. 2 Train. As soon as it
is cleared of the switch in front of you, proceed
as soon as possible.
No. 2 train will be backing into
Dunnville Lumber. Keep
continuing on, following the path where the
activity will end, handing the train over to SW
Division.
Caution: No pop-ups
to confirm, no pop-ups on any additional
instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR
management trust that
you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25
MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the
above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35
MPH
Main Switch = 45 MPH
Station
Stop(within the
platform) = 10 MPH
Drive Safely!
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net