North Eastern
Railroad 2004
Central Division
---------------------------
Route:
Chippewa
Work Order:
NECV-010-045
Divisional Special:
SW - CT
Contract: RP - CV
Coal Turn around
Type: Road Work
Time: 10:50 A.M.
Season: Winter
Weather: Clear
Difficulty: Easy
Train: SD40 -2
Class: 1
Call Sign: No. 1
Train
---------------------------
This is an
extension of
NECV-010-044 because of the limitations of MSTS.
Continuing No2. Train (part 1)
Reverse into
Dunville
Lumber using the far right siding
track
(looking back towards the rear of
the train). Then take the first four power units
and park them on Dunnville
Lumber 6 where the activity will end.
Switches are yours
and do not worry about the reverse point in front
of you. Make sure when backing that the switches
are set for the wye
into Dunnville, as
well as set to the far right siding,
(looking towards the back of the
train) in Dunnville
Lumber.
Caution: No pop-ups
to confirm, no pop-ups on any additional
instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR
management trust that
you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25
MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the
above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35
MPH
Main Switch = 45 MPH
Station
Stop
(within the platform) = 10 MPH
Drive Safely!
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net