North Eastern
Railroad 2004
Central Division
---------------------------
Route:
Chippewa
Work Order:
NECV-010-048
Divisional Special:
SW - CT
Contract: RP - CV
Coal Turn around
Type: Road Work
Time: 2:00 P.M.
Season: Winter
Weather: Clear
Difficulty: Easy
Train: 44 ton
switcher
Class: 1
Call Sign:
---------------------------
Activity Description:
Switching duties at
Dunville Lumber since
the NECV-010-047 has just dropped off
the consists and left
with the empties. The activity will end
automatically, when you park the switcher in front
of the power units for the coal train. Need to get
your switching duties done first so here is your
work order.
All to be placed on
Dunnville Lumber
sidings from the consist
at # 2 Siding
2 Bulkhead cars # 6
Siding
3 Red Santa Fe
Boxcars # 4 Siding
1 86' Milwaukee
boxcar # 5 Siding
3 Green BN boxcars #
4 Siding
6 Logs # 1 Siding
4 Wood chip #3 Siding
My suggestion would
be to start with the wood chip cars since they
will be the
hardest to
place. Be careful,
that coal train, does have switches blocked.
Caution: No pop-ups
to confirm, no pop-ups on any additional
instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR
management trust that
you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25
MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the
above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35
MPH
Main Switch = 45 MPH
Station
Stop(within the
platform) = 10 MPH
Drive Safely!
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net