North Eastern
Railroad 2004
Central Division
---------------------------
Route:
Chippewa
Work Order:
NECV-010-052
Divisional Special:
SW - CT
Contract: RP - CV
Coal Turn around
Type: Road Work
Time: 4:00 P.M.
Season: Winter
Weather: Clear
Difficulty: Easy
Train: SD40-2
Class: 1
Call Sign:
---------------------------
Activity Description:
Hook back up to the
loaded coal cars behind you, Take the right leg of
the WYE. Then once on the main track, back up to
Meridean Power,
exchange the loaded cars with the empties there
and head forward back to the SW Division. The work
order will end automatically next to the 5 blue
boxcars there.
Caution: No pop-ups
to confirm, no pop-ups on any additional
instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR
management trust that
you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25
MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the
above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35
MPH
Main Switch = 45 MPH
Station
Stop
(within the platform) = 10 MPH
Drive Safely!
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net