North Eastern Railroad
2004
Central Division's Bison
Rail
---------------------------
Route: NERR's Chippawa
Valley
Work Order: NECV-010-BR2
Type: Yard Shuttle
operations
Time: 10:00 A.M.
Season: Summer
Weather: Clear
Difficulty: Easy
Train: SD24, #2400, #2407
Class: 1
---------------------------
Activity Description:
A pair of Bison Rail's
GP18s has your consist ready on the main line. Backup,
connect all 3 consist of containers, and proceed to
the main yard. Work order will end automatically.
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR management trust
that you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25 MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35 MPH
Main Switch = 45 MPH
Station
Stop(within the platform) =
10 MPH
Drive Safely!
--------------------------
Bob Artim
North Eastern Railroad
Operations Director
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net