North Eastern Railroad
2004
Central Division's Bison
Rail
---------------------------
Route: NERR's Chippawa
Valley
Work Order: NECV-010-BR3
Type: Road work
Time: 11:00 A.M.
Season: Summer
Weather: Clear
Difficulty: Easy
Train: SD40T-2, #4527
Class: 1
---------------------------
Activity Description:
Pick-up the 3 consists of
double stack containers, and the 1 consist of empty
Naggy hoppers. You are taking them to the east route
connection on the Chippawa, where you will be waiting
on a west bound train. They will probably be a little
late, to exchange trains with them.
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR management trust
that you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25 MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35 MPH
Main Switch = 45 MPH
Station
Stop(within the platform) =
10 MPH
Drive Safely!
--------------------------
Bob Artim
North Eastern Railroad
Operations Director
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net