Central Division

Where Service and Safety Comes First!

 


Chippewa Valley Freight Operations

 
 

NECV-010-BR6 work order

 

North Eastern Railroad 2004

Central Division's Bison Rail

---------------------------

 

Route: NERR's Chippawa Valley

Work Order: NECV-010-BR6

Type: Local road work

Time: 1:15 A.M.

Season: Summer

Weather: Clear

Difficulty: Easy

Train: Bison Rail, #904, #906

Class: 1

---------------------------

Activity Description:

 

The local train you are driving has come down to pick up the consist at Dunnville Lumber. Reverse points are set for you to run into Dunnville and pick-up the 4 consists that are on the far right track (looking back from the engineer seat).

 

Proceed south to Durand Mfg. where you will need to pick-up 2, 86 foot boxes there, and place them on the front of the train.

 

After you accomplish that, proceed south to the SW Division Connection, just past the WYE. This work order will end automatically there, just before the double main, turns into a single main line. (After the WYE, just past MM 132)

 

Caution: No pop-ups to confirm, no pop-ups on any additional instructions.

It is up to the NERR engineer to get his job done to the best of their ability.

NERR management trust that you will accomplish the work order in good faith.

 

Warning: Have Fun !!!!!

--------------------------    

 

Drive Safely!

--------------------------

Bob Artim

North Eastern Railroad

Operations Director

--------------------------

Direct questions or problems to:

 

010

Dandy1

Dandy1@dtnspeed.net

 

 

 

Comments North Eastern Railroad
Last updated Tuesday, July 13, 2004 02:29 PM
Copyright © MMIII Mutagenix Inc.