North Eastern Railroad
2004
Central Division's
Bison Rail
---------------------------
Route: NERR's Chippawa
Valley
Work Order:
NECV-010-BR6
Type: Local road work
Time: 1:15 A.M.
Season: Summer
Weather: Clear
Difficulty: Easy
Train: Bison Rail,
#904, #906
Class: 1
---------------------------
Activity Description:
The local train you are
driving has come down to pick up
the consist at Dunnville Lumber. Reverse
points are set for you to run into Dunnville and
pick-up the 4 consists that are on the far right
track
(looking back from the engineer seat).
Proceed south to Durand
Mfg. where you will need to pick-up 2, 86 foot boxes
there, and place them on the front of the train.
After you accomplish
that, proceed south to the SW Division Connection,
just past the WYE. This work order will end
automatically there, just before the double main,
turns into a single main line. (After the WYE, just
past MM 132)
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR management trust
that you will accomplish the work order in good
faith.
Warning: Have
Fun !!!!!
--------------------------
Drive Safely!
--------------------------
Bob Artim
North Eastern Railroad
Operations Director
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net