Central Division

Where Service and Safety Comes First!

 


Chippewa Valley Freight Operations

 
 

NECV-010-BR7 work order

 

North Eastern Railroad 2004

Central Division's Bison Rail

---------------------------

 

Route: NERR's Chippawa Valley

Work Order: NECV-010-BR7

Type: Yard work

Time: 2:00 P.M.

Season: Summer

Weather: Clear

Difficulty: Easy

Train: Bison Rail, #904, #906

Class: 1

---------------------------

Activity Description:

 

Timet Titanium has just called, and their engineer for their switcher got hurt. Since your GP9s are in the area, you are called upon to take care of Timet Titanium.

 

The path is set to take you to Timet Titanium, but once there you will need to do your own switching. Be careful because the path into Timet will take you to the Overflow Standby Siding (where this activity will end).

 

First, proceed into Timet and grab the empty hoppers on Load #2.

Second, proceed back onto main to grab the consist.

 

Now proceed to drop the following in this order.

 

3 Wastewater tankers at Waste treatment

3 Liquid Nitrogen tankers at Load No. 2

5 Loaded hoppers at Dioxide Unloading

3 Airslide cars at Timet Standby

3 Hazmat boxes at Loading

The empty hoppers you have left go just in front of the Hazmat boxcars at Loading

 

Proceed to Overflow Standby next to the NERX switcher where this work order will end. (YOU MUST STOP)

 

 

Caution: No pop-ups to confirm, no pop-ups on any additional instructions.

It is up to the NERR engineer to get his job done to the best of their ability.

NERR management trust that you will accomplish the work order in good faith.

 

Warning: Have Fun !!!!!

--------------------------    

 

Drive Safely!

--------------------------

Bob Artim

North Eastern Railroad

Operations Director

--------------------------

Direct questions or problems to:

 

010

Dandy1

Dandy1@dtnspeed.net

 

 

 

Comments North Eastern Railroad
Last updated Tuesday, July 13, 2004 02:34 PM
Copyright © MMIII Mutagenix Inc.