North Eastern Railroad
2004
Central Division's
Bison Rail
---------------------------
Route: NERR's Chippawa
Valley
Work Order:
NECV-010-BR7
Type: Yard work
Time: 2:00 P.M.
Season: Summer
Weather: Clear
Difficulty: Easy
Train: Bison Rail,
#904, #906
Class: 1
---------------------------
Activity Description:
Timet Titanium has just
called, and their engineer for their switcher got
hurt. Since your GP9s are in the area, you are
called upon to take care of Timet Titanium.
The path is set to take
you to Timet Titanium, but once there you will need
to do your own switching. Be careful because the
path into Timet will take you to the Overflow
Standby Siding
(where this activity will end).
First, proceed into
Timet and grab the empty hoppers on Load #2.
Second, proceed back
onto main to grab the consist.
Now proceed to drop the
following in this order.
3 Wastewater tankers at
Waste treatment
3 Liquid Nitrogen
tankers at Load No. 2
5 Loaded hoppers at
Dioxide Unloading
3 Airslide cars at
Timet Standby
3 Hazmat boxes at
Loading
The empty hoppers you
have left go just in front of the Hazmat boxcars at
Loading
Proceed to Overflow
Standby next to the NERX switcher where this work
order will end. (YOU MUST STOP)
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR management trust
that you will accomplish the work order in good
faith.
Warning: Have
Fun !!!!!
--------------------------
Drive Safely!
--------------------------
Bob Artim
North Eastern Railroad
Operations Director
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net