North Eastern Railroad
2004
Central Division's
Bison Rail
---------------------------
Route: NERR's Hamilton
Northfolk
Work Order:
NEHN-010-BR1
Type: Road work
Time: 8:00 A.M.
Season: Autumn
Weather: Clear
Difficulty: Easy
Train: @D 40T-2
Class: 1
---------------------------
Activity Description:
A NERR
switcher been hustling
about all night in the yards as trains came in and
out, to get a shipment together of fertilizer
products to the SE Division. You will be taking the
Chippawa Flagship forward to the reverse, and then
connect to the 3, GP18s. Continue in reverse to the
yards where your consists are waiting. You will be
doing some manual switching passed the second
reverse arrow into the yards.
Pick up all the
consists on Eastbound #1 and Eastbound #2, and head
out to the CT-SE connection just passed MM 229 where
this work order will end automatically.
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR management trust
that you will accomplish the work order in good
faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25 MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the
above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35 MPH
Main Switch = 45 MPH
Station
Stop(within the platform)
= 10 MPH
Drive Safely!
--------------------------
Bob Artim
North Eastern Railroad
Operations Director
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net