Central Division

Where Service and Safety Comes First!

 


Hamilton Norfolk Freight Operations

 
 

NEHN-010-BR1 work order

 

North Eastern Railroad 2004

Central Division's Bison Rail

---------------------------

 

Route: NERR's Hamilton Northfolk

Work Order: NEHN-010-BR1

Type: Road work

Time: 8:00 A.M.

Season: Autumn

Weather: Clear

Difficulty: Easy

Train: @D 40T-2

Class: 1

---------------------------

Activity Description:

 

A NERR switcher been hustling about all night in the yards as trains came in and out, to get a shipment together of fertilizer products to the SE Division. You will be taking the Chippawa Flagship forward to the reverse, and then connect to the 3, GP18s. Continue in reverse to the yards where your consists are waiting. You will be doing some manual switching passed the second reverse arrow into the yards.

 

Pick up all the consists on Eastbound #1 and Eastbound #2, and head out to the CT-SE connection just passed MM 229 where this work order will end automatically.

 

Caution: No pop-ups to confirm, no pop-ups on any additional instructions.

It is up to the NERR engineer to get his job done to the best of their ability.

NERR management trust that you will accomplish the work order in good faith.

 

Warning: Have Fun !!!!!

---------------------------

 

Speed Limits:

 

Freight Runs:

 

Yards = 25 MPH

Sidings = 35 MPH

Main = Posted MPH

 

Siding Switch = 25 MPH

Main Switch = 35 MPH

 

Passenger Runs:

 

Add 10 MPH to the above.

 

Yards = 35 MPH

Sidings = 45 MPH

Main = Posted MPH

 

Siding Switch = 35 MPH

Main Switch = 45 MPH

Station Stop(within the platform) = 10 MPH

 

    

 

Drive Safely!

--------------------------

Bob Artim

North Eastern Railroad

Operations Director

--------------------------

Direct questions or problems to:

 

010

Dandy1

Dandy1@dtnspeed.net

 

 

 

Comments North Eastern Railroad
Last updated Monday, September 06, 2004 05:20 PM
Copyright © MMIII Mutagenix Inc.