Central Division

Where Service and Safety Comes First!

 


Hamilton Norfolk Freight Operations

 
 

NEHN-010-BR2 work order

 

North Eastern Railroad 2004

Central Division's Bison Rail

---------------------------

 

Route: NERR's Hamilton Northfolk

Work Order: NEHN-010-BR2

Type: Road work

Time: 10:00 A.M.

Season: Autumn

Weather: Clear

Difficulty: Easy

Train: GP18s and SD 40T-2

Class: 1

---------------------------

Activity Description:

 

You are on your way back from delivering a fertilizer consist SE

Division's border and have switched cabs. Northbound has left

you some work. You will need to pick up the 2 consist on Pleasant

Power #1 and #2 Siding and take them to the other SE Division's

border that connects to the Florida High Speed route. You will

need to keep your wits about you, and an eye on the AMP gauge for

the hills along the route.

 

The W/O will end at the SE Connection where you will be picking

up a coal unit for your return back.

 

Warning: Sand, speed, and timing will be your

friend uphill as well as downhill.

 

 

Caution: No pop-ups to confirm, no pop-ups on any additional instructions.

It is up to the NERR engineer to get his job done to the best of their ability.

NERR management trust that you will accomplish the work order in good faith.

 

Warning: Have Fun !!!!!

---------------------------

 

Speed Limits:

 

Freight Runs:

 

Yards = 25 MPH

Sidings = 35 MPH

Main = Posted MPH

 

Siding Switch = 25 MPH

Main Switch = 35 MPH

 

Passenger Runs:

 

Add 10 MPH to the above.

 

Yards = 35 MPH

Sidings = 45 MPH

Main = Posted MPH

 

Siding Switch = 35 MPH

Main Switch = 45 MPH

Station Stop(within the platform) = 10 MPH

 

    

 

Drive Safely!

--------------------------

Bob Artim

North Eastern Railroad

Operations Director

--------------------------

Direct questions or problems to:

 

010

Dandy1

Dandy1@dtnspeed.net

 

 

 

Comments North Eastern Railroad
Last updated Monday, September 06, 2004 05:21 PM
Copyright © MMIII Mutagenix Inc.