Central Division

Where Service and Safety Comes First!

 


Hamilton Norfolk Freight Operations

 
 

NEHN-010-BR3 work order

 

North Eastern Railroad 2004

Central Division's Bison Rail

---------------------------

 

Route: NERR's Hamilton Northfolk

Work Order: NEHN-010-BR3

Type: Road work

Time: 11:00 A.M.

Season: Autumn

Weather: Clear

Difficulty: Easy

Train: SD 40T-2 and GP18s

Class: 1

---------------------------

Activity Description:

 

You are on your way back from The SE Division with 30 Loaded coal hoppers, 16 empty naggy hoppers, 4 Sunoco Tanks.

 

You will be placing the empty Naggy hoppers on Combs Siding. Be careful there, for a Tamper is working on the siding, and moving about slowly working on the tracks.

 

After dropping the Naggy hoppers, continue onward to Pleasants Power #1 where you will drop the 30 coal NERX Hoppers then onto Eureka Oil.

 

The W/O will end at the Eureka Oil Distributors where you will place the engine and 4 tankers.

 

Warning: Sand, speed, and timing will be your friend uphill as well as downhill.

 

 

Caution: No pop-ups to confirm, no pop-ups on any additional instructions.

It is up to the NERR engineer to get his job done to the best of their ability.

NERR management trust that you will accomplish the work order in good faith.

 

Warning: Have Fun !!!!!

---------------------------

 

Speed Limits:

 

Freight Runs:

 

Yards = 25 MPH

Sidings = 35 MPH

Main = Posted MPH

 

Siding Switch = 25 MPH

Main Switch = 35 MPH

 

Passenger Runs:

 

Add 10 MPH to the above.

 

Yards = 35 MPH

Sidings = 45 MPH

Main = Posted MPH

 

Siding Switch = 35 MPH

Main Switch = 45 MPH

Station Stop(within the platform) = 10 MPH

 

    

 

Drive Safely!

--------------------------

Bob Artim

North Eastern Railroad

Operations Director

--------------------------

Direct questions or problems to:

 

010

Dandy1

Dandy1@dtnspeed.net

 

 

 

Comments North Eastern Railroad
Last updated Monday, September 06, 2004 05:22 PM
Copyright © MMIII Mutagenix Inc.