NEMN-066-05
: Fifth part of local delivery/pick-up
along the secondary tracks of
Monon route.
remark : these activities are not to be
continued but each one stops where the next one
begin.
North Eastern
Railroad 2004
Central Division
---------------------------
Route:
Monon
Work Order:
NEMN-066-05
Type: Local Freight
Time: 14:00
Season: Summer
Weather: Clear
Train: 2 NE FURX SD40
Class:
3
---------------------------
Activity
Description:
The rain has stopped,
and now the traffic is now very heavy.
This Work Order will
take us between Mac Doel
and Gosport (Silex
siding) with 2 pick-ups on the way.
Some grades are quite
difficult, so check your brakes and sand before
leaving.
Speed limits are as
posted, except there is a 25
mph maximum in the yards.
You must always
request clearance on entering the main line.
This
Workorder has
it's entire path laid
out. There is one erroneous
reverse point that will disappear but there is
also a pop up that lets you know why. If you
follow the path making sure all the Reverse Points
disappear as they should the activity will
complete as it should.
As the traffic very
is heavy, and there are some signal problems, you
have to hurry up AND to respect this
schedule :
Mac
Doel clearance:
14:08.00
Bloomington station :
14:11.30
Mile
219 : 14:14:30
Adams : 14:48.00 (warning
: 30 mph at the signal after Adams).
Stinesville :
14:55:00
Mile
205 : 14:59.30
MSTS
WARNING : Due to the
display complexity, MSTS WILL FREEZE for several
seconds (depending on your processor) between
14h00.15 and 14h00.30. In case of problem, modify
your display options.
DO NOT OVERSPEED
(Well done if you can avoid an
overspeed during this
activity).
Enjoy.
Chris (NERR #066).