North Eastern Railroad
2004
Central Division's Bison
Rail
---------------------------
Route: NEW, Wisconsin
Central
Work Order: NEWC-010-BR1
Type: Road Work
Time: 8:00 A.M.
Season: Summer
Weather: Clear
Difficulty: Easy
Train: Bison Rail SD45T,
#4515
Class: 1
---------------------------
Activity Description:
Military Train has come
back to the WC route and heading into Badger.
Full headlights, an
extended horn sequence at
crossings (longer
tones).
When proceeding into
Badger military base, a coded horn sequence
is
needed to lift the rail locks at the guard shack so
that you
do
not have to stop.
Your documents inside the
train state that 4 long and 4 short
tones
will notify the correct codes at the guard shack.
This work order will end
just before Badger North #4. Curves
are
to tight for you to deliver the cars safely, so the
NERR
RS1 will be pulling them
off for you in the following work order.
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR management trust
that you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25 MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35 MPH
Main Switch = 45 MPH
Station
Stop(within the platform) =
10 MPH
Drive Safely!
--------------------------
Bob Artim
North Eastern Railroad
Operations Director
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net