North Eastern Railroad
2004
Central Division's Bison
Rail
---------------------------
Route: NEW, Wisconsin
Central
Work Order: NEWC-010-BR2
Type: Yard Work
Time: 9:00 A.M.
Season: Summer
Weather: Clear
Difficulty: Easy
Train: RS1
Class: 1
---------------------------
Activity Description:
Military consist is on
the main track inside Badger's base. You will need to
place all wagons on Badger East #1 and Badger East #2.
Later, you will be sorting them out after inspection.
Place the Bison Rail
engine,(32775), on Badger
North #3 where other Bison Rail's engines are waiting
for departure.
Return to Badger Metal
works, for this work order to end automatically.
WARNING: For quality
control purposes, you must take a screen shot of the
Badger East #1 and Badger East #2 area. The screen
shot must consist of showing the wagons and showing
the road that cuts through Badger East #1 & #2, so
Bison Rail's Division Safety
Inspection (DSI) can
send you a report. Please send screen shots to the
Division leaders Dutchie or Dandy1 so they can send it
onto the DSI. Thank You !!!
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR management trust
that you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25 MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35 MPH
Main Switch = 45 MPH
Station
Stop(within the platform) =
10 MPH
Drive Safely!
--------------------------
Bob Artim
North Eastern Railroad
Operations Director
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net