North Eastern Railroad
2004
Central Division's Bison
Rail
---------------------------
Route: NEW, Wisconsin
Central
Work Order: NEWC-010-BR3
Type: Road Work
Time: 9:00 A.M.
Season: Autumn
Weather: Clear
Difficulty: Easy
Train: SD24s
Class: 1
---------------------------
Activity Description:
You are back at Reedsburg
trying to stay ahead of the grain harvest of the
Midwest.
Its a busy time at Dierker
farms and need to keep the bins empty and the flow of
grain going. It is a good thing the NE Division
is needing this grain at
this time of year as well.
Dierker Farms has 20
loaded grain cars at Reedsburg Yard Track #2 from a
couple of nights ago. Also through the night, they
have loaded 20 more grain cars that are at Dierker's
Grain Silo. Pick both of these consists up and take
them, just passed Lodi, where the NE Division will be
taking them the rest of the way.
Caution: No pop-ups to
confirm, no pop-ups on any additional instructions.
It is up to the NERR
engineer to get his job done to the best of their
ability.
NERR management trust
that you will accomplish the work order in good faith.
Warning: Have
Fun !!!!!
---------------------------
Speed Limits:
Freight Runs:
Yards = 25 MPH
Sidings = 35 MPH
Main = Posted MPH
Siding Switch = 25 MPH
Main Switch = 35 MPH
Passenger Runs:
Add 10 MPH to the above.
Yards = 35 MPH
Sidings = 45 MPH
Main = Posted MPH
Siding Switch = 35 MPH
Main Switch = 45 MPH
Station
Stop(within the platform) =
10 MPH
Drive Safely!
--------------------------
Bob Artim
North Eastern Railroad
Operations Director
--------------------------
Direct questions or
problems to:
010
Dandy1
Dandy1@dtnspeed.net