Central Division

Where Service and Safety Comes First!

 


Wisconsin Central Freight Operations

 
 

NEWC-010-BR3 work order

North Eastern Railroad 2004

Central Division's Bison Rail

---------------------------

 

Route: NEW, Wisconsin Central

Work Order: NEWC-010-BR3

Type: Road Work

Time: 9:00 A.M.

Season: Autumn

Weather: Clear

Difficulty: Easy

Train: SD24s

Class: 1

---------------------------

Activity Description:

 

You are back at Reedsburg trying to stay ahead of the grain harvest of the Midwest. Its a busy time at Dierker farms and need to keep the bins empty and the flow of grain going. It is a good thing the NE Division is needing this grain at this time of year as well.

 

Dierker Farms has 20 loaded grain cars at Reedsburg Yard Track #2 from a couple of nights ago. Also through the night, they have loaded 20 more grain cars that are at Dierker's Grain Silo. Pick both of these consists up and take them, just passed Lodi, where the NE Division will be taking them the rest of the way.

 

 

 

Caution: No pop-ups to confirm, no pop-ups on any additional instructions.

It is up to the NERR engineer to get his job done to the best of their ability.

NERR management trust that you will accomplish the work order in good faith.

 

Warning: Have Fun !!!!!

---------------------------

 

Speed Limits:

 

Freight Runs:

 

Yards = 25 MPH

Sidings = 35 MPH

Main = Posted MPH

 

Siding Switch = 25 MPH

Main Switch = 35 MPH

 

Passenger Runs:

 

Add 10 MPH to the above.

 

Yards = 35 MPH

Sidings = 45 MPH

Main = Posted MPH

 

Siding Switch = 35 MPH

Main Switch = 45 MPH

Station Stop(within the platform) = 10 MPH

 

    

 

Drive Safely!

--------------------------

Bob Artim

North Eastern Railroad

Operations Director

--------------------------

Direct questions or problems to:

 

010

Dandy1

Dandy1@dtnspeed.net

 

 

 

Comments North Eastern Railroad
Last updated Monday, September 27, 2004 08:32 PM
Copyright © MMIII Mutagenix Inc.