North East Division

Always on Track... Always on Time!

 


North East Corridor (NEC) 4.0 Freight Operations

 
 
NENE-100-01 work order

 

NERR NEC V4.0 CSX Copyright MMIV

G306: grain train from Locust Point to Waycross

------------------------------------

Work Order: NENE-100-01

Time: 7:30 a.m.

Season: Summer Weather: Clear

Duration: 2 hour 15 minutes (2.3 hrs)

Train: G306 (NERR U23B #4499 with #4493 and #5004 with 50 grain empties)

Class: 1 Easy

-------------------------------------------

Speed Limit: As Posted Yard 15 MPH and 50 MPH on Mainline

------------------------------------------------

Work Order

--Pickup Extra Units 32769-0 to 1 BALTIMORE PIER #1

--Pickup Empty grain 32770-0 to 24 BALTIMORE PIER #1

--Pickup Empty grains 32768-0 to 24 BALTIMORE PIER #2

-----------------------------------------------------

NOTE: The MSTS Work orders are shown in a bottom up order. This allows for each part to be reported as done. Manual switching at Baltimore Pier.

------------------------------------

Activity ends at ANACOSTIA JUNCTION.

+++++++++++++++++++++++++++++++++

This activity was designed on grpabear.

+++++++++++++++++++++++++++++++++++++++

Pool turn 12 you will take power and caboose to Baltimore harbor to gather up grain emts for Waycross then Run as G 306 from Harbor to Anacosta Jct.

===========================================

Traffic South Bound MARC commuters and OJ train

Traffic North Bound mixed manifest, Auto train and coal.

===============

Thanks

GaryH

NERR 100

 

 

Comments North Eastern Railroad
Last updated Sunday, August 01, 2004 08:24 PM
Copyright © MMIII Mutagenix Inc.