North East Division

Always on Track... Always on Time!

 


North East Corridor (NEC) 4.0 Freight Operations

 
 
NENE-100-02 work order

 

NERR NEC V4.0 CSX Copyright MMIV

Q207: Auto Train: Wilsmere Yard to Cleveland

------------------------------------

Work Order: NENE-100-02

Time: 6:00 a.m.

Season: Autumn Weather: Light Rain

Duration: 2 hours

Train: Q207 (NERR AC6000 #9905 and #9939 and SD40 #4212 with loaded  auto boxes and racks)

Class: 1 Easy

-------------------------------------------

Speed Limit: As Posted Yard 15 MPH and 60 MPH on mainline.

------------------------------------------------

Work Order

--PicKup AutoRacks and caboose 32768-0 to 25 WILSMERE Yard #2

 

-----------------------------------------------------

NOTE: Manual switching at Wilsmere.

------------------------------------

Train must stop to end activity at QN interlocking.

+++++++++++++++++++++++++++++++++

This activity was designed on grpabear's suggestions.

+++++++++++++++++++++++++++++++++++++++

Pool turn 12 you will take power and caboose to Baltimore harbor to gather up grain emts for Waycross then Run as G 306 from Harbor to Anacosta Jct.

===========================================

North Bound Traffic: Steel, Sulphur, Syrup, Coal, manifest and MARC communters. All DT.

 

===============

Thanks

GaryH

NERR 100

 

 

Comments North Eastern Railroad
Last updated Friday, September 10, 2004 06:42 PM
Copyright © MMIII Mutagenix Inc.