North Eastern Railroad 2004
North East Division
---------------------------
Route: NEC 4.0
Work Order: NENE-163-01c
Type: Passenger Express
Time: 13:18 / 1.8
Season: Summer
Weather: Clear
Difficulty: 1
Train: GP40 Intercity
---------------------------
Activity Description:
We're still
covering for the downed power that started in
NENE-163-01b and that's Why
we have diesel power.
You will See
quite a few lonely Acelas just sitting there waiting but
the passengers do NOT like to wait.
This Schedule
is fairly tight but possible. You will have time to make
up for any signal problems.
Something to
remember, the locomotive has an 85 mph limit!!!
Lots of AI in
this one, which means very few loose consists.
On the 2nd stop the time it
showed me as arriving was not the same as the time
displayed at the top of the F10 window.
I guess MSTS doesn't like
long distances between station stops either.
If this happens to your
machine , do not worry about
it , it's the Workorder , not
your trainsim install.
Have Fun
Bob