North Eastern Railroad Freight Activity
(c) 2003
NENJ 035 01a
-------------------------------------------------
Description:-
This activity is for the NORTH EAST
DIVISION NJC ROUTE V1.5 & involves
assembling a train in an industrial area
adjacent to
Weequahic
Lake. The train will be made ready for
moving to various destinations along the
LV & CNJ tracks.
Work Order: NENJ 035 01a
Time: 10:00 am
Season: Summer
Weather: Rain
Difficulty: Easy
Duration: 1hr 00min
Train: NE GP38-2 #1000 & NE F45 #340
Class: 1
-------------------------------------------------
There is a maximum Speed Restriction of 15
mph during this activity.
-------------------------------------------------
Activity Brief
--------------
Well, it's still raining & it looks like
it's set in for
the rest of the day.
You will be required to carry out ALL of
your own switching during this W.O.
The train MUST BE assembled in the correct
order (as laid out in the 'Work Order').
Car 32909-10 being at
the rear of the train.
There are 2 empty cars on the string at
Federal Warehouse,
these should be left on the siding at
Chesebro
Whitman
The train should be assembled on Team
Track 1 with the rear of the
train up to the
Mainline Signals.
When the train is assembled, uncoupling
your power will give you the 'Completed'
pop-up.
NOTE: You will not normally receive any
help from your
Conductor, however, you will be
given an option at the start of this W.O.
WORK ORDER
----------
Pick up string of boxcars from
Cardex Corp 1
Pick up string of
DoubleStacks from Federal Warehouse
DoubleStacks
to be placed in front of boxcars
Park on Team Track 2 as near to Mainline
Signal as possible
Pick up F45 #340 then collect string from
Badger Technologies.
Park the 2 empty cars of that string on
Chesebro
Whitman siding
Couple up the pipes to the front of the
pipes & coils on Team Track 3
Couple that string to rest of train.
---------------------------------------------------
Jaykay Engineer #035
North Eastern Railroad