North Eastern
Railroad Freight Activity (c) 2004
Work Order:
NENJ-022-01-Floatbridge Drill
Time: 9:30
Season: Summer
Weather: Clear
Duration: 1
hours
Train:
NERX MP 15 X601
Class: 1
Today you are to
work the Floatbridge
Drill. This will entail assembling a cut of cars
at HBS main yard and taking them to the
Floatbridge yard;
switching out the arriving cars, preparing the
cars to be loaded when the barge arrives and
taking the newly arrived cars to the HBS main yard
to assemble an outgoing train. In addition the
Maxwell House Coffee plant needs to be serviced.
>>>>>>>..........................................................<<<<<<<<<<<<<<<<<
>>>>>>>..........................................................<<<<<<<<<<<<<<<<<
>>>>>>>..........................................................<<<<<<<<<<<<<<<<<
In the event that
no text is triggered by assembling the outbound
train, you are instructed to park your engine on
the Engine house track.
|
PUP/DOF |
WAGONS |
NUMBERED |
FROM / TO |
Completed |
|
PUP |
4 |
32793-0-3 |
HBS Yard Track
6 |
|
|
PUP |
15 |
32796-0-14 |
HBS Yard Track
3 |
|
|
DOF |
4 |
32793-0-3 |
Maxwell 1 |
|
|
DOF |
15 |
32796-0-14 |
Floatbridge Siding
3 |
|
|
PUP |
4 |
32791-0-3 |
Maxwell 1 |
|
|
PUP |
18 |
32797-0-17 |
Floatbridge Siding
4 |
|
|
PUP |
3 |
32794-0-2 |
HBS Yard Track
7 |
|
|
PUP |
1 |
32001-0 |
HBS Yard Track
4 |
|
|
DOF |
4 |
32791-0-3 |
HBS Main Track |
|
|
DOF |
18 |
32797-0-17 |
HBS Main Track |
|
|
DOF |
3 |
32794-0-2 |
HBS Main Track
(head-end cars) |
|
|
DOF |
1 |
32001-0 |
HBS Main Track
(Caboose) |
|
|
PUP |
3 |
32795-0-2 |
Ferguson
Propeller |
|
|
DOF |
3 |
32795-0-2 |
HBS Main Track
(Power) |
|