Route:
Ohio Rail: Ohio River & Western RR
Division
Name:
NEOW 100-01A Mt Ephraim Logs
Description: Preparing a logging
load for Sarah Sawmill
Briefing: North Eastern Railroad
Freight Activity (c) 2003
NEOW
100-01A Logging Load
----------------------------------------
Work
Order: NEOW 100-01A Mt Ephraim
Logging
Board:
Local
Time:
7:27 a.m.
Season:
Summer
Weather: Clear
Difficulty: Easy
Duration: 1 hour 10 minutes
Train:
SW1500 #1056 and Slug #1400
Class:
3
----------------------------------------
There
are no Temporary Speed Restrictions
during this activity.
You
will be operating from the Mt.
Ephraim Logging
areas up to Mt Ephraim
Yards.
You are
cleared on the mainline from 8:10
a.m. to 9:00 a.m.
You
will be using SW1500 #1056 and you
may need both slugs to make the
grade.
Fire
has shut down the local source of
logs for the
Sarahville Sawmill. Mt
Ephraim Logging has got a special
order for 25 car
loads, they are cut, loaded
and ready to go. In this part you
will move the cars to Mt Ephraim
Yard 2 and 3.
Once
you dropped them off head over to
the refuel point and the activity
will end there
In the
second part you will haul them to
Dale.
As we
are a little light on power this
morning the grade up to Mt Ephraim
will be a challenge.
Enjoy!
_________________
Garry
NERR
#100
Notes:
1. All
yard switching is manual.
2.
Pickup in any order that you prefer.
3. Drop
off 15 cars on Mt Ephraim Yard #3
and 10 cars on Mt Ephraim Yard 2.
4.
After
your finished pull into refuel stop
in Mt Ephraim Yard (stub of #1)
5. Keep
the power on as it's quite a grade
up from the logging area.
Scroll
down if you want a hint:
A.
Pickup the extra slug as you
need the
power to get up the grade.
B. You
need to enter the ML (MP40.6) at a
speed of at least 29mph to make the
grade.