Work Order:
NEOW-026-23B
Time: 12:15 PM
Season: Summer
Weather: Clear
MSTS Difficulty: Medium
Duration: 3 hours 45
minutes (or more -- depends on how you drive)
Train: NERR SD40-2 &
SD40-2b
Activity Difficulty
Level: 3
----------------------------------------
2d
activity of the -23 series heading from N&JC to
Seattle.
This activity builds
the outbound car cuts for pickup by the road freight
operated under activity NENJ-088-23A. Following
this activity, the next in series will be
NEOW-088-23C.
You've just finished
performing setouts at
the Ironworks down the hill and enjoyed a quick
lunch with the station master here. You need to
pick up coal and general merchandise cars and take
them to Marietta yard, placing them in the correct
sequence for pickup by the through freight. Easy
ahead as you start, you're in a 15 MPH zone.
Speed limits:
yards: 15
sidings: 20 or posted speed, whichever is
lower
Main: 40 MPH or
posted speed., whichever
is lower
Drive Safely!
Operational Notes:
This activity is 98%
fully pathed so that the
engineer uses reverse points to make almost all
movements. On occasion the engineer will need to
set switches manually prior to reaching a reversing
point to complete required actions.
I tested this activity
extensively on two different systems. I use DirectX
9a.
All hills are possible
working within the established work order speed
limits.
Switching in Marietta yard -- when breaking up the
train prior to putting the car cuts on the
Interchange tracks, use the stub tracks from the
leftmost to the rightmost.
Alan Williams
North Eastern Railroad