----------------------------------------
Work Order:
NEOW-026-23D
Time: 6:15 AM
Season: Summer
Weather: Clear
MSTS Difficulty: Medium
Duration: 4 hours 45
minutes (or more -- depends on how you drive)
Train: NERR H24-66 x 2
Activity Difficulty
Level: 3
----------------------------------------
This activity
distributes the inbound car cuts set out by the road
freight operated under activity NEOW-088-23C.
Following this activity, the next in series will be
NEDF-026-23E.
It's early morning and they finished the
setouts off the N&JC -
Seattle through freight. You've drawn local duty
again. H24-66's for power, but should get you
there. Need to pick up assorted cars in the yard,
after picking up empties over the hill at
Tessmocker that are
headed back to the coal mines. You'll work your way
up to Cambridge where you'll end the local run,
probably around lunchtime. Easy ahead as you start,
you're in a 15 MPH zone. At least you're
coffe cup is full!
Speed limits:
yards: 15
sidings: 20 or posted speed, whichever is
lower
Main: 40 MPH or
posted speed., whichever
is lower
Drive Safely!
Operational Notes:
This activity is 98%
fully pathed so that the
engineer uses reverse points to make almost all
movements. On occasion the engineer will need to
set switches manually prior to reaching a reversing
point to complete required actions.
I tested this activity
extensively on two different systems. I use DirectX
9a.
All hills are possible
working within the established work order speed
limits.
Switching in Marietta yard -- when breaking up the
train prior to putting the car cuts on the
Interchange tracks, use the stub tracks from the
leftmost to the rightmost.
Alan Williams
North Eastern Railroad