North Eastern
Railroad 2003
---------------------------
Route:
Ohio & West Virginia
Build 10/w/update patch
Work Order:
NEOW-048-006
Time: 9:00 A.M.
Season: Autumn
Weather: Clear
Duration:
1:10:00
Train: SD40-2
with 100 empty grain hoppers
Class: 2
---------------------------
Good
morning,
After bringing
down the train from the Wisconsin Central
yesterday,
the train has been
cut and put into the yards. Your job today is
to
assemble the 5 cuts
of grain cars behind you and take them on down
to Cambridge
Interchange yard and will continue on from
there.
There will be
heavy traffic this morning.
In front of you
is Recycler and his
crew, heading for the coast.
Behind you in the
yard is Dandy1, heading to the stub. (nature
call probably)
Also behind you
is Elementh moving
tankers to the fuel depot.
You will have to
wait on Elementb
to reverse next to you before you start your
day.
You need to watch
out for those two...Rumor has it that
Elementb and
Dandy1 were
playing tug of war
with the switchers last night on each end of a
graincar cut.
You will have to
manually throw the switches BEHIND you.
Switches in front
are in the Dispatcher's hands.
No particular
order to pick the 5 cuts of grain cars.
when picking the
five cuts, keep in mind to keep the
view to the back
of the train
because the front of train will go through 2
tunnels.
Reminder: lots of
slack in this consist...make sure one end is
done moving before
you reverse the
other direction.
Have Fun.
---------------------------
Speed Limits:
Yards
= 20
Main
= 50
Other
= as posted
Yard Switch
= 20
Main Switch
= 40
Drive Safely!
--------------------------
048
Dandy1
Designer of
Activity
Dandy1@dtnspeed.net