North Eastern
Railroad 2003
---------------------------
Route: Ohio
Build 10 with updates
Work Order:
NEOW-048-007
Time: 10:30
Season: Autumn
Weather: Clear
Duration: 1:00
Train: SD40-2
w/100empty grain cars
Class: 1
---------------------------
After a 20
minute wait for the late Northbound
Passenger Train, You are on your way to
Caldwell.
DISPATCH!! A
crew down in Marietta was putting in Fiber
Optic cables and cut our control
system....All Signals are down, but switches
were set before system went down.
Only a few
local switchers are working the Industrial
Sidings but all have been locked into the
sidings since the backups
wouldn't work
either. I have notified the switching crew
at Caldwell Grain to keep a look out for
ya....All
traffic South has
been stopped at Union.
Helpful Hints:
You must still ask permission to proceed
through
a Signal that has
failed. A block that a signal has failed
will have
a 15 MPH
restricted speed area in that block.
---------------------------
Speed Limits:
Yards = 25
Main = 50
Other = as posted
Yard
Switch = 15
Main
Switch = 35
-----------------------------------------------
For those who
enjoy switching>>>NEOW-048-008 will be
switching the
cars at Caldwell Grain.
For those who
enjoy road work>>>NEOW-048-009 will be
moving
freight while
NEOW-048-008 does the switching.
Drive Safely!
--------------------------