North East Division

Always on Track... Always on Time!

 


Ohio & West Virginia (Ohio Rails) Freight Operations

 
 
NEOW-048-007 work order

 

North Eastern Railroad 2003

---------------------------

Route: Ohio Build 10 with updates

Work Order: NEOW-048-007

Time: 10:30

Season: Autumn

Weather: Clear

Duration: 1:00

Train: SD40-2 w/100empty grain cars

Class: 1

---------------------------

After a 20 minute wait for the late Northbound Passenger Train, You are on your way to Caldwell.

 

DISPATCH!! A crew down in Marietta was putting in Fiber Optic cables and cut our control system....All Signals are down, but switches were set before system went down.

Only a few local switchers are working the Industrial Sidings but all have been locked into the sidings since the backups wouldn't work either. I have notified the switching crew at Caldwell Grain to keep a look out for ya....All traffic South has been stopped at Union.

 

Helpful Hints: You must still ask permission to proceed through

a Signal that has failed. A block that a signal has failed will have

a 15 MPH restricted speed area in that block.

---------------------------

 

Speed Limits:

 

            Yards = 25

             Main = 50

            Other = as posted

      Yard Switch = 15

      Main Switch = 35

-----------------------------------------------

For those who enjoy switching>>>NEOW-048-008 will be

switching the cars at Caldwell Grain.

 

For those who enjoy road work>>>NEOW-048-009 will be

moving freight while NEOW-048-008 does the switching.

 

Drive Safely!

--------------------------

 

 

 

 

 

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 02:45 PM
Copyright © MMIII Mutagenix Inc.