North
Eastern Railroad 2003
---------------------------
Route:
NEOW build 10 with
updates
Work Order:NEOW-048-009
Time:12:00:00
Season:
Autumn
Weather:
Clear
Duration:00:30:00
Train:SD40-2
Class:1
---------------------------
After
dropping the empty consist off and
having a quick
lunch with everyone
here (good
to see Jim with the new recruits), we
are back moving again. NEOW-048-008, and
after the trainer connects will be
switching Caldwell. There is a
Geep
switching here along with a
Robel
checking tracks.
The
brakeman has been checking over our
train after lunch and he feels that the
second unit has a bad air leek, and the
turbo went out on the third unit. We
have shut both of them down. We are
going to go ahead and take some boxcars
and limp up to Florence where we will
get our orders on what to do about these
units.
You will be
starting at 5 MPH FORWARD.
You must
stop and reverse.
Just follow
the path and make sure you cross all
your reverse points.
We will
hook up the boxcars
at MCE. Mfg #4 and drop at
Florence Yard.
Continue on
the path and the activity will end
shortly.
---------------------------
Hints: None
of the AI trains will bother your path.
Its a very
simple act to do, but just be
careful
so the grades
dont get to
you. Remember
to ask permission through any Reds and
make sure the reverse
knuckle
disappears
before reversing.
Speed
Limits:
Yards = 15
Main = 50
Other = as posted
Yard
Switch = 15
Main
Switch = 25
Drive
Safely!
--------------------------
Bob
Artim
North
Eastern Railroad
Operations
Director
--------------------------
048
Dandy1
Dandy1@dtnspeed.net
Designer of
Activity
--------------------------
Hope you
enjoyed!!!