North East Division

Always on Track... Always on Time!

 


Ohio & West Virginia (Ohio Rails) Freight Operations

 
 
NEOW-048-013 work order

 

 

North Eastern Railroad 2003

---------------------------

 

Route: Ohio Build 10/updates

Work Order:NEOW-048-013

Time:8:00

Season: Autumn

Weather: Clear

Duration:1 hour

Train:SD40-2

Class:1

---------------------------

Good Morning Crew:

I hope you had a good night sleep at the Empty Arms Hotel at Marietta.

Today on your way, You will pick up 2 Loaded consist at Peterson Grainery.

Drop 10 empties off the back at Peterson Grainery #2 and 10 more at #1.

There is a freight and commuter trains heading Southbound, but should not

interfere. After the BUDDS went through McConnelsville, track repair truck

found a bad rail linkage and 2 ties that HAVE to come out. Track repair

crews are working as fast they can. Hopefully they will be done by the

time you reach there (they know you are coming). Dispatch will notify

you of the situation. (before McConnelsville) Most likely they ran into

some other problems and you will have to hold at the entrance to McConnelsville.(befor MM18)

---------------------------

Helpful hints:

Even though you have most of the cars loaded. Don't be to quick with the brakes going to McConnelsville after Peterson Grainery deliveries. You will be running some notch 7's and 8's but don't back out of it to soon even though you may be going downhill. Reason for this is...half the train may be going downhill...other half is going uphill still.

 

Due to MSTS, wasn't able to have paths at Peterson Grainery. There is message showing you which switch that you will have to stop at without going past the signal...I would save game before this. It will be tough stopping this long train....just remember from the previous acts that the back end of the train may not be moving...but your front may have gone a long ways.

 

Good Luck and hope you enjoy!!!

-------------------------

 

Speed Limits:

 

            Yards = 25

             Main = 50

            Other = as posted

      Yard Switch = 15

      Main Switch = 25

 

Drive Safely!

--------------------------

048

Dandy1

Designer of Activity

Dandy1@dtnspeed.net

 

 

 

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 02:45 PM
Copyright © MMIII Mutagenix Inc.