North Eastern Railroad 2003
---------------------------
Route:
Ohio Build
10 with updates
Work Order:NEOW-048-014
Time:9:30
Season:
Autumn
Weather:
Clear
Duration:0:40
Train:SD40-2
Class:1
---------------------------
The
previous act has you
stopped
at
McConnelsville entrance
waiting for track repair
crew to finish.
You are on your way to drop this
consist off and to pick
Ratledge
Grain....
Don't be in a hurry...10
MPH or less is enough....Ratledge
Grain has already started to
dump grain on the ground. There
are some nice
views
looking back at you train out
the cab and in the cab.
(up arrow, down
arrow from inside of cab)
NO
AI trains and ask permission to
pass REDS
(sometimes you may
not get
permission right
away
until
your closer to the signal).
Follow paths unless otherwise
instructed. This
act
will end after
Ratledge
has been picked up and you are
reversing towards the Platform.
I
hope you have
enjoyed
following these acts. Hopefully
by now, you will understand
what
to expect with my acts.
Its
been a long
journey around Ohio,
exchanging 100 empty
hoppers
for full ones. You will ONLY
have pop-ups to guide you in
this activity.
(be
alert and aware of everything
around you,
take notes in case
there are some
numbers to
remember).
Won't be long now to go to
Zanesville with 100 LOADED
hoppers.
Hints: I have completed this but
have had MSTS sound crashes
around the track repair
equipment.
Feel free to save. I also have
been able to still save even
after MSTS freezes.
by hitting F2 and
a guess
with the mouse curser for
the save button.
IMPORTANT Reminder: Only load
one of my activities at a time
to avoid conflicts between them.
---------------------------
Speed Limits:
Yards = 25
Main = 50
Other = as posted
Yard Switch = 15
Main Switch = 25
Drive Safely!
--------------------------
048
Dandy1
Designer of Activity
Dandy1@dtnspeed.net