North East Division

Always on Track... Always on Time!

 


Ohio & West Virginia (Ohio Rails) Freight Operations

 
 
NEOW-LFLD-004-01-FLO work order

 

North Eastern Railroad Freight Activity (c) 2002

NEOW-LFLD-004-01-FLO Monday  8:00 am

----------------------------------------

Work Order: NEOW-LFLD-004-01-FLO

Time: 8:00 a.m.

Season: Winter

Weather: Clear

Difficulty: Easy

Duration: 30 min

Train: GP38-2 #1000

Class: 1

----------------------------------------

There are no Temporary Speed Restrictions during this activity.

 

You will operating from the Florence Yards down to the Caldwell Grain siding.

 

You have been cleared on the mainline from 8:00 a.m. to 8:15 a.m.

 

You are cleared on the Caldwell Grain siding from 8:10 a.m. to 8:30 a.m.

 

You will be using GP38-2 #1000.  In addition, you will pickup 3 helper GP38-2’s (32771-0 to 2) on the Florence Yard - Engine Storage and Service siding.  After you pickup the 3 helper GP38-2’s you will need to head down to Caldwell Grain.

 

Caldwell Grain has 23 Grain Hoppers that need to be delivered to Marietta by 9:30 a.m. They are set out on three different sidings at follows:

 

32770-0 to 6   Caldwell Grain 4 siding

32769-0 to 6   Caldwell Grain 3 siding

32768-0 to 8   Caldwell Grain 1 siding

 

Assemble the entire train in the order indicated: 32771, 32770, 32769, and 32768.  Once assembled you will need to backout of the Caldwell Grain area and on the passing siding.  Once on the passing siding pull forward to the southern end of the passing siding.  Stop just prior to the red light that controls entrance onto the mainline.

 

Drive Safely!

___________________

Jim Vaughan

North Eastern Railroad

 

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 02:45 PM
Copyright © MMIII Mutagenix Inc.