North Eastern Railroad
Freight Activity (c) 2002
NEOW-LFLD-004-01-FLO
Monday 8:00 am
----------------------------------------
Work Order:
NEOW-LFLD-004-01-FLO
Time: 8:00 a.m.
Season: Winter
Weather: Clear
Difficulty: Easy
Duration: 30 min
Train: GP38-2 #1000
Class: 1
----------------------------------------
There are no Temporary
Speed Restrictions during this activity.
You will
operating from the
Florence Yards down to the Caldwell Grain siding.
You have been cleared
on the mainline from 8:00 a.m. to 8:15 a.m.
You are cleared on the
Caldwell Grain siding from 8:10 a.m. to 8:30 a.m.
You will be using
GP38-2 #1000. In addition, you will
pickup 3 helper GP38-2’s
(32771-0 to 2) on the Florence Yard - Engine Storage
and Service siding. After you pickup the 3
helper GP38-2’s you will need to head down to
Caldwell Grain.
Caldwell Grain has 23
Grain Hoppers that need to be delivered to Marietta
by 9:30 a.m. They are set out on three different
sidings at follows:
32770-0 to 6 Caldwell
Grain 4 siding
32769-0 to 6 Caldwell
Grain 3 siding
32768-0 to 8 Caldwell
Grain 1 siding
Assemble the entire
train in the order indicated: 32771, 32770, 32769,
and 32768. Once assembled you
will need to backout of
the Caldwell Grain area and on the passing siding.
Once on the passing siding pull forward to the
southern end of the passing siding. Stop just prior
to the red light that controls entrance onto the
mainline.
Drive Safely!
___________________
Jim Vaughan
North Eastern Railroad