North West Division

We Rule the Grades!

 


Dual Fictional Freight Operations

 
 
NEDF 109 F01a
 work order

 

NEDF 109 F01a - #109 robertr - Part 2 of 6

Work Order: NEDF 109 F01a

Time: 9:10 am

Season: Summer

Weather: Rain

Duration: 1h 15m

Train: GP38

Class: 3

-------------------------------------------------

NOTES: - Since it's raining and we just enough power to make it, don't forget to sand if needed and don't forget to tab for permission if needed.

 

Pickup your consist on the main directly behind you first, then the siding and we're ready to go.

 

BWFLumber, Suggestions: Don't forget to use the '7' yardview key if needed.

Take Centerbeam in with you. Take two left turns,

picking up #32772-0, place it behind the chip cars.

Then go in on supply track, leaving the Centerbeam there

runaround and pickup the chippers #32772-0-3 and Centerbeam.

Go back and setout the #32782-0 centerbeam,

backup to the main and we're off to Winterland Ski area

 

Set your own Switches. Cut your train behind #32782-2, then Pickup #32775-0 and 32774-0, move them to the opposite track, then setout #32782-1,2 at the same location, keeping at least part of your train within the signal boundaries (between the signals)

 

Speed limits are:

15 yard

30 Sidings

45 Main unless otherwise posted

30 on 10degree or sharper switches

They are rigidy enforced so be careful

Hope you enjoy your trip

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 02:47 PM
Copyright © MMIII Mutagenix Inc.