NEDF 109 F01a - #109
robertr - Part 2 of 6
Work Order: NEDF 109 F01a
Time: 9:10 am
Season: Summer
Weather: Rain
Duration: 1h 15m
Train: GP38
Class: 3
-------------------------------------------------
NOTES: - Since it's raining
and we just enough power to make it, don't forget to
sand if needed and don't forget to tab for permission if
needed.
Pickup your consist on the
main directly behind you first, then
the siding and we're ready to go.
BWFLumber, Suggestions:
Don't forget to use the '7' yardview key if needed.
Take Centerbeam in with
you. Take two left turns,
picking
up #32772-0, place it behind the chip cars.
Then go in on supply track,
leaving the Centerbeam there
runaround and pickup the chippers #32772-0-3 and
Centerbeam.
Go back and setout the
#32782-0 centerbeam,
backup
to the main and we're off to Winterland Ski area
Set your own Switches. Cut
your train behind #32782-2, then Pickup #32775-0 and
32774-0, move them to the opposite track, then setout
#32782-1,2 at the same location, keeping at least part
of your train within the signal boundaries (between the
signals)
Speed limits are:
15 yard
30 Sidings
45 Main unless otherwise
posted
30 on 10degree or sharper
switches
They are rigidy enforced so
be careful
Hope you enjoy your trip