NEDF 109 F01b - #109
robertr - Part3 of 6
Work Order: NEDF 109 F01b
Time: 10:30 am
Season: Summer
Weather: Clear
Duration: 1h 15m
Train: GP38
Class: 3
-------------------------------------------------
NOTES: - It's quit
raining for awhile, but don't forget to sand if
needed. Also, don't forget to use Yardview (7 key) if
needed and don't forget to tab for permission if
needed.
-------------------------------------------------
We solved the problem.
Bad connection in the Reefers air hose, but it's
fixed, so backup, pickup the rest of the train and
we're ready to go.
Setout 4Woodchippers at BWF Logging Chips Out track.
Keep the main clear for traffic and you are
responsible for your own switches. Don't forget to
re-set the last switch for straight-through.
M&H - Again, you have to
do the switching. Clear the main, put your first 3
cars on the Team Track, take in #32785-7,8
then go in and get the Reefers first, tack them onto
the same track as the containers. Then runaround and
bring them out, keeping them on the front.
Back in to pickup Cement
cars at Baers North Interchange, South Track and we'll
break for lunch
Speed limits are:
15 yard
30 Sidings
45 Main unless otherwise
posted
30 on 10degree or sharper
switches
They are rigidy enforced
so be careful
Hope you enjoy your trip