NEDF 109 F01e - #109
robertr - Part6 of 6
Work Order: NEDF 109
F014e
Time: 13:00 am
Season: Summer
Weather: Rain
Duration: 2h 10m
Train: GP38
Class: 4
-------------------------------------------------
NOTES: - The rain has
finally lifted. Since the derailment on the ADF and
the re-routing through here the traffic is hopping.
However, it's all downhill, so it should be an easy
finale. However, the only popups are when you
successfully pickup or setout a car, so you will have
to figure out where you are at and what you are doing.
Also a majority of this is not dispatch controlled. It
only gets you there. You have to get in and out.
-------------------------------------------------
1. Go forward to reverse
to other track to pickup 2 cars #32770-0,1
at Alpine Station. Then back and
pickup the remainder of the cars. Dispatch
Switched
2 MM15.5 - .Burkes drop
Auxilliary #32768-8, Cold Storage #12-16 Reefers.
Dispatch gets you there, but you have to go in and do
the switching.
If you run into a Red at
MM6.9 make sure your switch is set to go straight. If
you've accidentally hit an incorrect switch before
this, changing it to straight will keep you on track.
I've only had this happen once, but it is possible.
Beware of Grade from
MM3.0 to Nuggett
You do your own switching
from here on out.
4. Nugget Transfer1 #9,10
5. Nugget Paper Plant
#32768-0,1
6. Nugget Paint #22,23
7. Fabric #3, 19
8. Post Dispatch #2
9. Manley Tools #11
7. Andrews #20, 21
8. Team Track #17, 18, 24
#32770-0,1
NOTES: The WO will not
show completed on F11, but will show up completed on
the evaluation.
I would appreciate some
feedback as to whether you want popups telling you
everything or figuring it out yourself with no popups.
Once again:
Speed limits are:
15 yard
30 Sidings
45 Main unless otherwise
posted
30 on 10degree or sharper
switches
They are rigidy enforced
so be careful