NEDF
109 L03 - Part 1. Taking empty gondolas from
NWater to BWF Mining & bringing a load back
Work Order: NEDF 109 L03
Time: 7:45a
Season: Summer
Weather: Clear
Duration: 1h 33m
Train: GP38 #1000
Class: 1, 4 (depending on
choice of popups)
-----------------
Your crew drew this
extra-board trip since you were close by. NoWater
Construction company supplies all the sand, ballast
and winter materials needed for the entire area and is
beginning their stockpiling now rather than waiting to
the last minute. You are making their first trip which
should be an easy one going to BWF Mining running with
empties, except for the fact you are rated as very low
priority.
----------------
You are designated as
train #1000 for this trip, the same as your engine
number
If you want popups, which
I would strongly advise, you need to back up until you
get a message verifying that they are turned on.
Otherwise, you're on your own.
------------------
The switches are dispatch
controlled on the main, but not any of the sidings or
yards.
Take the engine behind
you as a helper
You are not cleared to
cross the main until 7:49
You are going back to
NoWater to assemble your train in the following order.
MM73.6 -
At NoWater pickup
#32810-0-5
on NWEmpties
#32809-0-13 on NW
Unloaded and
#32801-0-14 on NW Holding
1 in that order
MM91.9 - 30mph crossover
MM92 - 30mph on Monkeys
Eyebrow passing siding
MM93.6 - 30mph crossover,
then resume speed once your train has cleared the
Xover.
Then you are simply to
get the unit to BWF and back.
-----------
General Information:
Speedlimits:
15mph - yards
30mph - 10degree or
tighter crossovers which are all we have today
60mph - maximum due to
being low priority
The fuel filler pipe is
slightly forward of the 'N' in NERR
------------------------
RobertR NERR Eng #109