North West Division

We Rule the Grades!

 


Dual Fictional Freight Operations

 
 
NEDF 109
L03a  work order

 

NEDF 109 L03a - Part 2 This is Sarataga Springs to BWF Mining

Work Order: NEDF 109 L03a

Time: 9:30a

Season: Summer

Weather: Clear

Duration: 2h 26m

Train: GP38 #1000

Class: 1, 4

-----------------

In part one we ended up with a new set of orders and are now picking up some more cars and helpers to take to BWF Mining.

----------------

You are designated as train #1000 for this trip, the same as your engine number

The switches are dispatch controlled on the main, but not any of the sidings or yards.

----------------

Take the engine behind you as a helper

Attach it #32814-0 to the front of East Bound 1

Pickup WestBound 1( #32824-0-18)

Pickup EastBound 1 (#32814-0 & #32815-0-17)

 

Go to the yard lead next to main and wait until you have clearance at 9:45 then head East Approx 2 minute delay depending on how quick you are in the yard

MM 107-109 - Xovers are rated at speed limit

MM 114.6 - EA-NU behind you to pass at Cedar Ridge (also see info below)

            Approx delay is 10:12 - 10:18 - 10:21

MM145 Marshall -  Xover - 30mph

Marshall Station - an 8-10 minute delay

            Approx delay is 10:58-11:03-11:06 (time to refresh your virtual coffee supply)

MM152 Baers W - Xover - 30mph

MM6.4 - you may have to back up to prod the AI to proceed if he's stuck

MM11.1 BWF Jct - Xover - 30mph

 

When you arrive at BWF, cut your train before the loader, take the two helpers behind leaving the mid-train where it is, then go to the Main Office for Lunch on the house, while they process your unit. This is where it will end for this section. Continued in L03b

-----------

General Information:

There are three extended waits for AI to pass

SS-before you leave the yard .. approx 2 minutes

Cedar Ridge-9 minutes (I suggest getting out of the cab via 2,3,4 or 7 key and enjoy the fresh air) :-)

Marshall-8 minutes - same as above

The reverse point at Cedar Ridge and Marshall is not a reverse point, but a passing point. Clear it, wait for the AI to go around, then proceed as normal. You may have to move forward slightly to wake the signals up. Us '7' Yard view if you wish to track it's progress. Same at Marshall (make sure to clear both ends of the siding)

 

btw, you are not required to fill in an incident report for running over any hostile traffic at the second crossing after leaving the yard. They just won't stay put behind the crossing lights :-)

 

 Speedlimits:

15mph - yards

30mph - 10degree or tighter crossover

60mph - maximum due to being low priority

 

The fuel filler pipe is slightly forward of the 'N' in NERR

------------------------

RobertR NERR Eng #109

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 02:47 PM
Copyright © MMIII Mutagenix Inc.