NEDF
109 L03c - Part4. BWF Mining back to NoWater,
stopping at Marshall
Work Order: NEDF 109 L03c
Time: 12:30p
Season: Summer
Weather: Rain
Duration: 1h 01minutes
Train: GP38 #1000
Class:
-----------------
NEDF
109 L03c Part4. Just
returned from lunch for the return trip to NoWater
with a load of winter materials for distribution to
the area highway departments. It has begun to
rain (one of these high altitude afternoon showers
that pop up out of nowhere), so the trip may be slower
than anticipated since we're already a very low
priority unit and this may complicate our progress.
----------------
You are designated as
train #1000 for this trip, the same as your engine
number
-----------
Your WO is as follows:
You are to pickup
#32840-0-30, #32844-0 and #32838-0-17 directly behind
you and head on out to NoWater
The red at the BWF
Junction is not a reverse point, but once again a
passing point. Simply pull up until it clears, then
once opposing traffic goes by, inch forward to wake up
the signal.
Once up the hill at Baers
Canyon, drop off your end helpers on South Interchange
main behind the switch so he can back up and return to
BWF.
-----------
General Information:
Dispatchers will take
care of the switching until you get to NoWater where
you take over and do your own.
Speedlimit: As posted
except
Due to the rain and class
of train, a 50mph max speed limit or lower if posted.
20mph - BWF Yard
30mph - 30degree or
tighter crossovers
If you have Sky!Conductor,
either Ink Blots or heavy rain would be appropriate
for this segment.
------------------------
RobertR NERR Eng #109