NEDF
109 L03d - Part5. BWF Mining back to NoWater,
starting at Marshall
Work Order: NEDF 109 L03d
Time: 13:30p
Season: Summer
Weather: Rain
Duration: 1h 44minutes
Train: GP38 #1000
Class: 2
-----------------
NEDF
109 L03d Part5. Continuing
from Marshall for the return trip to NoWater with a
load of winter materials for distribution to the area
highway departments. It is still raining, so
the trip may be slower than anticipated since we're
already a very low priority unit and this may
complicate our progress.You are still train #1000 for
this trip.
-----------
Your WO is as follows:
Since we were longer than
the siding, we just did a single sawby to let the
Starr get through, we are now waiting for her to load
and go. You will have to pull forward to prod her on
:-)
Continue to NoWater
Without letting any
secrets out, at Cedar Ridge be sure you stop before
the crossover, since it's your way back. You are
cleared all the way back to the signal behind you to
make it. Also you will NOT be docked for breaking the
15mph speed limit between MP117-114. It will show up
on the evaluation, but shouldn't count.
Last stop for this part
is Saratoga Springs, to leave
the setouts there
-----------
General Information:
Dispatchers will take
care of the switching until you get to NoWater where
you take over and do your own.
Speedlimit: As posted
except
Due to the rain and class
of train, a 50mph max speed limit or lower if posted.
15mph - Yards
30mph - 30degree or
tighter crossovers
If you have Sky!Conductor,
either Ink Blots or heavy rain would be appropriate
for this segment.
------------------------
RobertR NERR Eng #109