NEDF
109 L03e - Part6. Saratoga back to NoWater
Work Order: NEDF 109 L03e
Time: 3:15p
Season: Summer
Weather: Clear
Duration: 1h 45minutes
Train: GP38 #1000
Class: 2
-----------------
NEDF
109 L03e Part6. Continuing
from Saratoga for the return trip to NoWater with a
load of winter materials for distribution to the area
highway departments. It has finally cleared up,
we're a very low priority unit but we are on our way
home.We are still train #1000 for this trip.
-----------
Your WO is as follows:
Place 2 helpers (player 4
& 3) on middle of facilities track after the Steam
Facilities switch. Pickup #32859-0-23
Head for NoWater
At Monkeys Eyebrow, you
are waiting for the shuttle from Saratoga to come by
and pass. This is not a reverse point, but a passing
point. Clear it, then move
slightly forward to the signal to re-activate it. It
will be a few minutes before the shuttle has cleared
the next block.
At NoWater there are
various ways of doing this so am leaving you on your
own. You have a path in and out,
the interim switching is left up to you. Use '7' for
yardview if needed. Any order will count as long as
they are deposited in the correct place.
#32859-0-7
Holding one
8-15 NW Loaded
16-23
Unloader
Go back to Jacks Meadow
where the activity will end.
-----------
General Information:
Problems: if you put the
cars where they should go at NoWater, but do not
receive confirmation or it says incomplete on the
evaluation, this is I believe due to the front coupler
and the way you have to uncouple more than a string of
six.
Dispatchers will take
care of the switching until you get to NoWater where
you take over and do your own.
Speedlimit: As posted
except
60mph max speed limit or
lower if posted.
15mph - Yards
30mph - 30degree or
tighter crossovers
30mph - Sidings
------------------------
RobertR NERR Eng #109