----------------------------------------
Work Order:
NEDF-026-23E
Time: Noon
Season: Autumn
Weather: Rain
MSTS Difficulty:
Medium
Duration: 4
hours 50 minutes (or more -- depends on how
you drive)
Train: NERR
SD24HH x 4
Activity
Difficulty Level: 3
----------------------------------------
Activity NEDF-026-23E --
5th in the -23 Series.
You're starting
the run with a brace of SD24's. You've drawn
the local switching run heading over to
Marshall where you'll drop off cars headed
east and west. The westbound cars will be
picked up by the through frieght in activity
NEDF-088-23F. You'll switch out the cars
dropped off by the through freight in activity
NEDF-026-23G-.
Pull out into the
yard and follow the reversing points to couple
to your outbound car cuts.
Speed Limits:
Yards:
15 MPH
Mains/Branch:
40 MPH
Drive Safely!
Operational
Notes:
This activity is
95% fully pathed so that the engineer uses
reverse points to make most movements.
I tested this
activity extensively on two different
systems. I use DirectX 9a.
All hills are
possible working within the established work
order speed limits or exceptions as granted by
popups.
There are two
potential waits for opposing trains -- neither
should be more than 6 minutes. The first is
near BWF Mining, the second is Marshall.
Alan Williams
North Eastern
Railroad