Work Order:
NEDF-067-03A
Time: 9:00
Season: Summer
Weather: Clear
Duration: 3:45
Train: SD40-2
Class: 2
Delivery of 6 Generators and
30 coils of high transmission wire.
(Subject to change
based on engineering demands or project
extension)
The engineering
Department of Washington State Power Authority
has tendered the contract to NERR (North Eastern
Railway) the task of delivering 6 generators to
Rock Island Hydro Electric Project on the
Columbia River Approximately 12 Miles downstream
from Wenatchee Washington.
Said Equipment to be
delivered in bulk on the agreed upon Date.
Penalties will
assessed if work is
delayed or the project is halted.
Monies owing for
this transportation will be paid in full at
completion,
NERR to provide all
State and Federal operating Permits and
Permissions Operating rights on NERR track lines
from points of origin for oversized load and
weights.
All engineers and
conductors are to be certified railway personnel
and security is of concern.
The Dam has been
closed, and all of the Current electric
generating equipment is being removed and
upgraded. This is not a staged Project as the
Dam and facilities are getting a complete refit.