~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Part 2 of 2
~~~~~~~~~~~~~~~~~~~~~~~~~~
NERR NW ADFRR
Copyright MMIV
Freight Service:
Valley Mining to Circus City
------------------------------------
Work Order:
NEDF-100-01a
Time: 15:15 p.m.
Season: Spring
Weather: Rain
Duration:
2 hour
40 minutes
Train: L-CSNU-20
(NERR SD-40-2
#4212 with #4207 with boxes and reefers for
Lake Hurst)
Class: 1 Easy
-------------------------------------------
Speed Limit: As
Posted SD40-2: Max. speed:
65 mph
------------------------------------------------
Work Order:
Pickups:
--PK 32768-0 to
28 CIRCUS CITY
Outgoing 1 HE
--PK 32770-0 to
12 MONKEYS EYEBROW ME Industrial Track RE
SetOuts:
--SetOut
32768-0 to 12 BAERS CANYON South Interchange
-----------------------------------------------------
NOTE: The MSTS
Work orders are shown in a bottom up order.
This allows for each part to be reported as
done.
------------------------------------
Continuation of
NEDF-100-01. This series ends at the
interconnection with
Glorieta. Note 20 MPH speed
restriction flags mark the spot where you must
STOP and then the activity will end.
============================================
Conductors Note:
1. Engine speed
is restricted to 65 MPH.
2. Easy trip the
first 45 minutes, with a
little more grades thereafter. Ruling
grade occurs at MP 112 Cedar Ridge. I
was about 10 MPH
on this grade!
3. The pickup of
reefers at Monkeys Eyebrow should be placed on
the end of the train.
4. The drop off
at Baers Canyon is
straight forward as the switches are set. Cut
the train so that you can back the CP cars on
to the Interchange after manually switching.
5. You must stop
at Niggett once
you are in the temporary speed limit.
Engineer Notes:
1. Traffic: 15:22
MP 56 NT_CC_007 and 16:50 MP 126 SV_CC_001
2. Monkeys
Eyebrow Pickup 16:00; 16:30 MP 110; 17:00 MP
135; 17:30 MP 152 and 18:00 MP 173
---------
GaryH
NERR #100