Work Order:
NEDF-109-11-F02 - A continuation of
NEDF-109-F01
Time: 7:30 am
Season: Summer
Weather: Clear
Duration: 40min
50min or 1hr 38min (See text file)
Train: SW1500
#1060 & SW1500 #1056 (Supposed to have the
SD40's back, but .....
Class: 4
-------------------------------------------------
A continuation of
NEDF-109-F01. The
return trip to North Fork. Finally
getting some good weather, the traffic is
cleaned out, but there's some heavy work to
do. You will get popups when you successfully
pickup or setout a car, but you are going to
have to follow the WO closely. Also a majority
of this is not dispatch controlled. It only
gets you there. You have to get in and out.
This will end
when you stop at the first signal past Burkes
siding
NOTE: One
exception to the above ..
Burkes Setouts are backwards. Hoppers should
be first, then Stock, followed by Stock
pickups. Otherwise everything is set out for
you correctly. Although the window will not
give a "Done", it will show up on the
evaluation correctly
Also see below
additional items
Good Luck and
we'll see you at Burkes
RobertR #109
DO NOT READ BELOW
UNLESS YOU HAVE TROUBLE: ;-)
Hints, tips and
gotcha's:
Until you get out
of Nuggett, there is no pathing. You are on
your own. If you can, use the WO order for how
they should be collected. If you're not sure,
it's Nuggett Fabric, Manleys Tools, Andrews
Clothiers, Nuggett Light & Power,
Nuggett Concrete.
Then tack them onto the back of North RailLink
2, run around, collect them and you're on your
way.
Don't forget to
tab for permission
This uses only
front coupler for the first 40 minutes or so
and is in the following order.
Pickup empty Bethgon
Hoppers and Concrete Hoppers first.
Back them up and tack them onto RailLink 2
behind the other cars. Then go back and get
the remaining cars and leave them on the long
South Siding. Run around, collect everything,
then back up to get them
and you are on your way. This is the longest
way, but has the best chances of completion
(and is what I based the long version time on,
but yours will vary)
If you have
trouble and cannot complete it, you can do a
short form or any variation of it. The easiest
(and most reliable) variation is as follows:
Simply pickup the
North RailLink 2 track and continue forward
from there (ignoring the Nuggett front coupler
business). You will come up with the last five
or six pickups incomplete, but ignore them. It
will still end successfully and you will
simply have a shorter time. There are two
evaluations included as two different examples
of time and configuration.
Do not trigger
the Reverse Point the first time you go into
Burkes. Then when you come out, it may be
there and may not. If it is visible, simply go
past the opposing direction signal to trip it
and back up. If it is not visible, go past the
opposing signal about a train length, then
backup and tab for permission, continuing on
your way.