Work Order:
NEDF-109-11-F02c and/or
Work Order:
NEDF-109-11-F02c-EZ (which is the same except
has no conflicting AI)
Time: 14:30pm
Season: Summer
Weather: Clear
Duration: 2hrs
5min
Train: Furx
SD40-2 #3048
Class:
1
-------------------------------------------------
Part four -
Continuing the return trip from Baers
Interchange to North Fork. You will get popups
when you successfully pickup or setout a car,
but you are going to have to figure it out for
yourselves. Also only the mainline path is
dispatch controlled. It only gets you there.
You have to get in and out and find the
correct track where needed.
There are no
speed restrictions at the moment and you are
waiting at Baers Interchange for a Green
You are working
the industries below ..
see WO for
particulars
2:46-3:36 - M&H -
Keep some part of your train within signal
boundaries at all times and
be careful of
splitting the switches. Also, main needs to be
cleared by 3:00
Clear main first,
(put first 4 reefers on Team Track in front of
others Schloggerville bound). Pull remainder
to M&H Grocers Siding, taking the setouts with
you (8 reefers). Make sure you toggle the
Reverse Point if it still shows up or you will
have a permanent red. If it doesn't show up,
don't worry about it. For some reason it is
clearing the first time around.
Back
them onto
Containers Track 2, pickup 3 reefers, tack
them onto front of 8 to be setout, then set
them out.
Last, go back and pickup
the 3 TOFC at back of Containers Track 1
(making sure to hit the reverse switch, since
this will toggle the path back on for you).
You should be backing in to get your TOFC at
exactly 3:13. If you are early, just back up a
bit and watch the AI go by. If you are late,
I'm not sure what the consequences will be
;-) Take them out to the front of the lead
and leave them for the moment.
When back on
main, put the 40ft Milw Box car in front of
the ones on Team Track
Pickup Logger
track, the Pickups you just brought down and
the Team Track last and that's it.
3:47-4:13 - BWF
Logging - Pickup only - There are two helpers
at the buffer on Facilities track if you need
them. Pickup Loggers, Chippers, then engines
if needed, pull them back then push in to
runaround (or take them out to the main and
runaround), back them onto the main and you
are on
Drop the two
helpers off at the East Signal to Winterland.
Drop your cars within the signal boundaries,
go forward and back the engines in, then
pickup your cars and head for West Winterland
The activity will
end on the west side of Winterland when you
stop at the red signal there.
There are many
gotchas in this, so if you have problems read
the bottom of the text file for additional
help
Good Luck.
RobertR #109