North West Division

We Rule the Grades!

 


Dual Fictional Freight Operations

 
 
NEDF-109-11-F02c work order

 

Work Order: NEDF-109-11-F02c and/or

Work Order: NEDF-109-11-F02c-EZ (which is the same except has no conflicting AI)

Time: 14:30pm

Season: Summer

Weather: Clear

Duration: 2hrs 5min

Train: Furx SD40-2 #3048

Class: 1

-------------------------------------------------

Part four - Continuing the return trip from Baers Interchange to North Fork. You will get popups when you successfully pickup or setout a car, but you are going to have to figure it out for yourselves. Also only the mainline path is dispatch controlled. It only gets you there. You have to get in and out and find the correct track where needed.

 

There are no speed restrictions at the moment and you are waiting at Baers Interchange for a Green

 

You are working the industries below .. see WO for particulars

 

2:46-3:36 - M&H - Keep some part of your train within signal boundaries at all times and be careful of splitting the switches. Also, main needs to be cleared by 3:00

 

Clear main first, (put first 4 reefers on Team Track in front of others Schloggerville bound). Pull remainder to M&H Grocers Siding, taking the setouts with you (8 reefers). Make sure you toggle the Reverse Point if it still shows up or you will have a permanent red. If it doesn't show up, don't worry about it. For some reason it is clearing the first time around.

 

Back them onto Containers Track 2, pickup 3 reefers, tack them onto front of 8 to be setout, then set them out.

 

Last, go back and pickup the 3 TOFC at back of Containers Track 1 (making sure to hit the reverse switch, since this will toggle the path back on for you). You should be backing in to get your TOFC at exactly 3:13. If you are early, just back up a bit and watch the AI go by. If you are late, I'm not sure what the consequences will be ;-)  Take them out to the front of the lead and leave them for the moment.

 

When back on main, put the 40ft Milw Box car in front of the ones on Team Track

 

Pickup Logger track, the Pickups you just brought down and the Team Track last and that's it.

 

3:47-4:13 - BWF Logging - Pickup only - There are two helpers at the buffer on Facilities track if you need them. Pickup Loggers, Chippers, then engines if needed, pull them back then push in to runaround (or take them out to the main and runaround), back them onto the main and you are on

 

Drop the two helpers off at the East Signal to Winterland. Drop your cars within the signal boundaries, go forward and back the engines in, then pickup your cars and head for West Winterland

 

The activity will end on the west side of Winterland when you stop at the red signal there.

 

There are many gotchas in this, so if you have problems read the bottom of the text file for additional help

 

Good Luck.

 

RobertR #109

 

 

 

Comments North Eastern Railroad
Last updated Sunday, June 27, 2004 04:25 PM
Copyright © MMIII Mutagenix Inc.