Work Order:
NEDF-109-11-CC-CL
Time: 8:10am
Season: Summer
Weather: Clear
Difficulty:
Difficult
Duration: 2hrs
30min to 3hrs 15min (depending on skill level)
Train: GB Alco
C424 #452
Class:
?
--
Valley mining is
re-enforcing some of the structural timbers in
the underground mines and you have been
assigned the job of getting the materials
there. There is also an extra engineer along
getting his certification for the ADF which
means you can do it as Trainer, or Trainee.
Following is your work order but items in WO
are not necessarily in order. Many can be
consolidated to cut down on number of moves.
----
CC Yard -
PU Outgoing 3 -
according to WO
Cureton - setouts
SO CLog Holding 1
- 32768-2-6
SO Cl Supplies -
32768-0,1
SO CLog Holding 4
- 32768-7-9
Move Bulk3 to
Clog Holding 3 - 32780-0-5
Move CLog Holding
1 to Log Loader - 32782-0-4
Cureton - Pickups
PU Bulk2 -
32779-0-7
PU CL Supplies -
32781-0-3 (These are Class1.1 explosives and
need to have a 6 car buffer between them and
engine/caboose at all times)
PU CLog loader -
32785-0-5
PU CLog Holding 2
- 32783-0-9
PU both Engines
on tail of wye - 32786-1,0
Sort and Assemble
Train when finished
Primary Engine -
32786-1,0
* 32785-0-5
* 32781-0-3
* 32779-0-7
* 32783-0-9
* Caboose
Restricted Speeds
are as follows:
15mph CC Yard to
50mph speedlimit past Station
30mph Crossover at both
ends of One Mile Canyon. MP6.6 and
MP7.76
There will be two
short delays. One at end
of first double track MP1.8, the second one at
One Mile Canyon - MP 6. After you have
made it to Cureton, there is no time schedule
since any AI would not be visible anyway.
Problems:
Be careful of
splitting the switches. There are numerous
chances to do it and it's usually fatal by the
time you realize it.
The Alco hangs up
very badly on some of the upper level turnouts
for some reason. Just keep the power to it and
it will eventually go.