Work Order:
NEDF-109-11a-CL-VM
Time: 12:15pm
Season: Summer
Weather: Clear
Difficulty:
Difficult
Duration: 2hrs
22min
Train: GB Alco
C424 #452 + Helpers
Class: 1
--
Valley mining is
re-enforcing some of the structural timbers in
the underground mines and you have been
assigned the job of getting the materials
there. There is also an extra engineer along
getting his certification for the ADF which
means you can do it as Trainer, or Trainee.
----
Once into the
yard use the 7 key for yardview if needed.
Valley Mining -
You do your own switching when backing out of
the wye
Set Caboose off
to side to take back with you (Outgoing ladder
maybe )
SO Incoming 3 *
0-13-30
SO Incoming 4 *
0-9-12 (Behind Crossover)
SO Incoming 4 *
0-3-8 (In front of Crossover)
PU All of
Outgoing 1
PU All of
Outgoing 2
When finished
pull up and hold prior to signal for clearance
back
NOTE:
30mph Crossover
at MP1.2 East (Mntn
Div Cutoff)
You are running a
HazMat Key Train with Class1.1 Explosives.
Restrictions are:
*6 car buffer
between engine/caboose
*50mph Maximum
speed
*30mph (Nat'l,
but 25mph for ADF) after visual check of a
wayside detector message if everything seems
to be clear until next wayside detector clears
it. If not, you must stop immeditely and
notify dispatch.
*Manifest should
be visible at all times and easily accessible
in case of problems.
Problems:
Do NOT roll-back
at any time when starting up grade