Work Order:
NEDF-109-11b-VM-CC
Time: 2:45pm
Season: Summer
Weather: Rain
Difficulty:
Medium
Duration: 2hrs
45min
Train: GB Alco
C424 #452 + Helpers
Class:
?
--
We are on the
return trip with a string of loaded hoppers
going to Circus City to be sent on to their
destination from there. We are waiting for
dispatch at the signal leaving VM.
----
There is not much
documentation needed on this one since it is a
cut-and-dried trip back to CC.
Only 20 miles at most.
However, it has begun to rain and we are once
again severely short on power, so something
different has to be done.
At CC, you are
going in on Outgoing 1. Clear the ladder, then
take your 3 engines and seesaw your way to the
fuel pump where the activity will end. You
will do the switching
NOTE:
20mph restriction due to
rain and weather until Klosen Ridge, where you
may resume speed.
Problems/Notes:
I would suggest
speeds no more than 10-12mph at MP1 (before
KR) and 35mph at MP3 after Junctionville
You can make it
without running in the red for more than a
minute or two at a time. Be careful of the
Traction Motors.
There
are no AI since the
conditions are hectic enough as it is with too
much possible variation in time.
RobertR #109 Hope
you enjoy. Comments/criticisms welcome ;-)