Part two
NEDF109X01a-WF-Ada-CC-EB - Switching Ada R&G, then
East bound
Work Order:
NEDF109X01WFa-Ada-CC-EB
Time: 10:00a
Season: Summer
Weather: Clear
Duration: 1h 21m
Train: SD40-FURLX
Class: 1
The assigned engineer
has called in sick and you are the only one
available at the time to get this train to its
destination. Pick your engines up and be on your
way.
Your pickups and drops
will be confirmed as you accomplish them
Follow the reverse
points to pick up your consists (only the first car
is listed in the yard), then head for Ada R&G across
the river.
Back the entire train (it's
downhill) into the siding, then move back far enough
to cut from #32779-0 on back behind the next
crossover.
Take first engine, run
around and collect those to move them back to where
you can separate them.
Cut 32779-8 to end
Then back #32779-0-7 to
very back of Incoming track on left hand side
Go forward and backup
on Cement Plant 2 (very right hand side) to
pickup #32783-0-9
Place them in front of
#32779-8 that you dropped earlier and pull them all
up behind the remainder of the train on the main
siding.
Run around the front to
pickup everything and you're on your way.
You should be clear of
the siding around 11:18, but it's not critical.