North West Division

We Rule the Grades!

 


Dual Fictional Freight Operations

 
 
NEDF109X01WFa-Ada-CC-EB work order

 

Part two

NEDF109X01a-WF-Ada-CC-EB - Switching Ada R&G, then East bound

 

Work Order: NEDF109X01WFa-Ada-CC-EB

Time: 10:00a

Season: Summer

Weather: Clear

Duration: 1h 21m

Train: SD40-FURLX

Class: 1

 

The assigned engineer has called in sick and you are the only one available at the time to get this train to its destination. Pick your engines up and be on your way.

 

Your pickups and drops will be confirmed as you accomplish them

 

Follow the reverse points to pick up your consists (only the first car is listed in the yard), then head for Ada R&G across the river.

 

Back the entire train (it's downhill) into the siding, then move back far enough to cut from #32779-0 on back behind the next crossover.

 

Take first engine, run around and collect those to move them back to where you can separate them.

 

Cut 32779-8 to end

 

Then back #32779-0-7 to very back of Incoming track on left hand side

 

Go forward and backup on Cement Plant 2 (very right hand side) to

pickup #32783-0-9

 

Place them in front of #32779-8 that you dropped earlier and pull them all up behind the remainder of the train on the main siding.

 

Run around the front to pickup everything and you're on your way.

 

You should be clear of the siding around 11:18, but it's not critical.

 

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 02:48 PM
Copyright © MMIII Mutagenix Inc.