North West Division

We Rule the Grades!

 


Dual Fictional Passenger Operations

 
 
NEDF109 BUDD XMAS 2003a work order

 

NEDF109BUDDXMAS2003a - Part 2 M&H to Nuggett.

 

Work Order: NEDF109BUDDXMAS2003a (part 2)

Time: 7:46 am

Season: Winter

Weather: Light Snow

Duration: 1h 28m

Train: BUDD RDC

Class: 1

 

After many interruptions, you're stopped at a signal waiting for Dispatchers clearance. Continue as before. Note: most of the reverse points are not reverse points but waiting points. Pull up to them, stop, then inch forward to wake up the signal. Alpine Helper and Emergency Siding are the only two true reversing points. Make sure you clear them before changing directions.

 

Speed limits:

15mph yards

30mph sidings off mainline

30mph 10degree crossovers (every one on this section)

Otherwise as posted

 

NOTES: Timing is critical on this to avoid permanent Reds

Meets at:

8:03-8:06 Alpine Helper (Short wait) opposing Tank cars for North Baers Interchange

8:17-8:27 Emergency Siding (Long Wait) opposing. Local

8:54 Burkes (Follow into Nuggett) Hot Reefer unit train

9:10 MP5 Opposing Carrying empty grain and misc cars back to the west

 

 

Cautions and Comments: Try to jostle the innocent passengers no more than is required. Keep under 30mph on the long station sidings. It doesn't look very prototypical to come out of the switch at 55mph.

________________________________________

 

Notes: To delete this set of activities and any remnants, simply do a find in the Train Simulator root folder, search (find)  "NEDF109BUDDXMAS*.*" without the quotes and delete all results.

 

When installing, do not overwrite any files. They should be the same as what you already have.

 

Robert Reedy Eng.#109 robertr@adfrr.com

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 02:49 PM
Copyright © MMIII Mutagenix Inc.