NEDF109BUDDXMAS2003c1a
- Part 8 Optional - Final
'local' shuttle picking up Valley Mining in winter
snow. If you have Sky!Conductor
I would advise "Powder" with 1000meters of
visibility to look like it should realistically
Work Order:
NEDF109BUDDXMAS2003c1a (part 8)
Time: 12:45 pm
Season: Winter
Weather: Snow
Duration: 1h 5m
Train: CMT#046
Class: 1
This is continuing on
down into the mine and back up to
Junctionville. All
switches will be set for you. At the mine, stop in
front of the engine house, then back track and
continue to Junctionville
We are stopping at
Ghost Valley on the way back up, not down.
To be continued in
NEDF109BUDDXMAS2003d (part 9), going on to
Ada