North Eastern Railroad
Freight Activity (c) 2003
NEMP 003 01d 12:43 am
----------------------------------------
Work Order: NEMP 003 01d
Board:
Time: 12:43 a.m.
Season: Autumn
Weather: Clear
Duration: 1 hrs 10 min
Train: Extra 9237 West
Class: 1
----------------------------------------
You're halfway home, but
you'll be dodging NERR's annual Employee Appreciation
Special.
It wouldn't be a good
thing to delay Mr. Artim's pride and joy.
Be careful coming down
the mountain and watch your speed through the
switches.
Max
speed through all turnouts are listed in the
Timetable and must be adheared to.
Timetable
NERR
Hi-Line Subdivision
Speed -
Maximum Passenger Freight
Shelby to Conkelly
79 MPH 60 MPH
Speed-Permanent
Restrictions
MP 1151.4 to MP
1166.5 30 MPH 25 MPH
MP 1166.5 to MP
1169.1 35 MPH 30 MPH
MP 1169.1 to MP
1173.7 45 MPH 40 MPH
MP 1173.7 to MP
1180.7 50 MPH 40 MPH
MP 1180.7 to MP
1184.2 40 MPH 35 MPH
MP 1184.2 to MP
1185.0 60 MPH 45 MPH
Speed-Switches and
Turnouts
End of 2 main tracks
Java 30 MPH 25 MPH
Through crossovers at
Essex 35 MPH 35 MPH
End of 2 main tracks at
Pinnacle 35 MPH 35 MPH
End of 2 main tracks at
Paola 35 MPH 35 MPH
Through crossover at Red
Eagle 35 MPH 35 MPH
End of 2 main tracks at
Nyack 50 MPH 50 MPH
Other Special
Instructions
Trains departing sidings
on proceed indication,
except at Glacier Park, may
increase speed to 35 MPH after engine has
passed signal.
Have a safe trip!
___________________
M.R. Roberts
Trainmaster
North Eastern Railroad